Operations and Maintenance
The mission of the Public Works Maintenance Division is to manage, maintain, and repair public infrastructure and equipment with the safety of the community as our primary responsibility.
Transportation-related services of the Maintenance Division include:
- Traffic operations, inlcuding sign, signal and striping maintenance.
- Operating Eugene's 9,136 streetlights.
- Maintaining 538 centerline miles of dedicated rights of way, including 432 miles of improved asphalt streets, 31 miles of improved concrete streets, and 75 miles of unimproved streets.
- Repairing and maintaining 673 miles of sidewalks and 10,614 sidewalk access ramps
- Maintaining 97 miles of onstreet bike lanes and 35 miles of offstreet paths.
- Sweeping and flushing all curbed streets (funded through stormwater fees).
- Removing snow and sanding icy streets.
- Right-of-way management and utility work in the public way.
- Maintaining 17,208 traffic signs and 9,803 street name signs.
- Operating and maintaining 230 traffic signals.
- Pickup and delivery of leaves (funded through stormwater fees).